Facilities Information

Administration Building

745 - 2nd Ave East Brooks

  • This facility was constructed in 1990 and is heated by hot water. It is 2492 square metres in size.
  • 2012/2013 Utility Costs per square metre = $32.45

Alcoma

Rainier, Alberta

  • The original wood frame building, which is the northern part of the facility, was built in 1948. The 1974 addition consisted of a new administration area, washrooms, 2 classrooms, and a new gymnasium. The latest addition in 1978 added 4 classrooms, change and shower rooms, and some storage space. Both of the 1974 and 1978 additions are built of masonry construction.
  • The interior finishes of this building are block, drywall, and vinyl covered drywall, all of which are coated with an alkyd base paint.
  • The entire school is heated with forced air furnaces. Some classrooms have individual furnaces (shelve-a-duct) and other classrooms are heated by centrally located furnaces which service a number of classrooms. All of the furnaces have been inspected and have had the necessary repairs or alterations made.
  • This school has a capacity of 206 student spaces and is 2177.1 square metres in size. In 2012/2013 there are 92 students enrolled making the Utilization Rate 44%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:

    • Maintenance Costs $12.71

    • Custodial Costs $15.00

    • Utility Costs $13.48

    • TOTAL PLANT OPERATION AND MAINTENANCE COSTS $41.19


Bassano

Bassano, Alberta

  • The original Bassano School was built in 1956. In 1962 four classrooms and two bathrooms were added onto the north side of the original building and finally in 1969 a major addition was added onto the east side of the existing structure. This addition consisted of five classrooms, stage/gymnasium, administration area, and also bathroom and shower facilities. A major modernization started in 2007 with completion in 2009.
  • The interior finishes of this school range from drywall to block and brick finishes. These finishes are all covered with an alkyd base paint.
  • The school is heated by a hot water boiler and located in the east boiler room and a steam boiler located in the west boiler room. All the heat is provided by radiant fin tubes located on the outside walls of the classrooms.
  • This school has a capacity of 479 student spaces and is 5076.36 square metres in size. In 2012/2013 there are 310 students enrolled making the Utilization Rate 65%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:

    • Maintenance Costs $7.24

    • Custodial Costs $22.68

    • Utility Costs $18.07

    • TOTAL OPERATION AND MAINTENANCE COSTS $47.99


Brooks Composite High School

650 - 4th Ave East Brooks, Alberta

  • The original building of this school was constructed in 1965. An industrial art's wing was added onto the northwest corner of the school in 1973. In 1990, an addition to the west side of the school was built to accommodate storage and home economics facilities. In 1991, a kitchen was added onto the west side, an administration area was added onto the south side, and a gymnasium and C.T.S. facilities were added onto the northeast side of the school. Also, at that time, during the 1992 program year, the entire facility was modernized. This construction and modernization was completed in August of 1994.
  • The interior of this school has a combination of block, brick, drywall, and fabric finishes all of which are in excellent condition. The building is heated with two, 8 million BTU hot water boilers and the entire facility, with the exception of the gymnasium and C.T.S. areas, are cooled with conventional roof top mounted air conditioners. The metal roof covers the entire facility, meaning that there are no existing areas of conventional built up roofing (tar and gravel) in service.
  • The Brooks Composite High School has a capacity of 1011 student spaces and takes up an area of 9374 square metres. In 2012/2013 there are 539 students making the Utilization Rate 53%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $5.00

    • Custodial Costs $24.05

    • Utility Costs $20.13

    • TOTAL OPERATION AND MAINTENANCE COSTS $49.18


Brooks Junior High School

124 - 4th Ave. East Brooks, Alberta

  • This school was originally built in 1953. This facility is made of masonry construction with small portions of wood frame construction in the 1959, 1985, and 1972 sections. In a follow up to 1985 construction there was a modernization in 1986 which upgraded the mechanical and electrical of the entire school. In addition to the mechanical and electrical, new glazing and flooring were installed.
  • The interior of this school has a combination of drywall, block, and brick finishes, all of which are covered with an alkyd base paint.
  • The heating is supplied by a combination of hot water boilers and heat pumps. The heat pumps also provide some cooling but this does not occur throughout the entire structure.
  • The building envelope is in excellent condition. All the doors and windows in the school were removed and replaced in 1986. The type of doors and windows installed were of a high standard and provide an excellent weather seal. The capacity of this school is 613 student spaces and is 5563 square metres in size. In 2012/2013 there are 415 students enrolled making the Utilization Rate 68%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $8.56

    • Custodial Costs $24.95

    • Utility Costs $23.04

    • TOTAL OPERATION AND MAINTENANCE COSTS $56.55


Central School

112 - 4th Ave. Brooks, Alberta

  • This facility was built in 1962 of masonry construction, and was completely modernized during the 1997/1998 school year. During that time all of the building's major components were replaced or upgraded.
  • In 2008, portables were added on to the north side of the school.
  • The capacity of this school is 312 student spaces and has an area of 2836.88 square metres. In 2012/2013 there are 482 students enrolled making the Utilization Rate 154%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $6.18

    • Custodial Costs $35.40

    • Utility Costs $21.42

    • TOTAL OPERATION AND MAINTENANCE COSTS $63.00


C.T.S. Trailer

Rural Schools

  • Diesel Compressor - 2012/2013 Diesel Fuel Costs $10,118.72
  • This unit has a capacity of 25 student spaces and is 78 square metres in size.

Duchess School

Duchess, Alberta

  • This school was originally built in 1956 with additions taking place in 1959, 1966, 1982, 1994, and 1996. The original building and all the additions were made of masonry construction, with the exception of the 1996 addition which is framed construction. A major modernization of this facility started in 2007 with completion in 2009.
  • The interior of this school has finishes consisting of block, brick, and drywall. These finishes are covered with alkyd based paint in some areas and acrylic latex paint in other areas.
  • The capacity of this school is 407 student spaces and is 4166.62 square metres in size. In 2012/2013 there are 401 students enrolled making the Utilization Rate 99%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $9.32

    • Custodial Costs $31.80

    • Utility Costs $22.24

    • TOTAL OPERATION AND MAINTENANCE COSTS $63.36


Eastbrook School

417 - 7th Street East Brooks

  • This school was originally built in 1975 with masonry construction. That same year, 6 portable classrooms were added on to the west side of the school. In 1977, 4 more portables were attached to the south side of the building. Then the most recent of 2 portable classrooms were added onto the south side of the building in the fall of 1994.
  • The core of this school is heated by means of a central hot water boiler located in the mezzanine adjacent to the gymnasium area. The portable classrooms (12 in total) are heated by individual forced air furnaces in each classroom. They also have individual roof top air conditioning units for each classroom.
  • The interior finishes of this school range from brick, block, drywall, and fabric finishes, most of which are covered with an alkyd based paint.
  • The capacity of this school is 396 student spaces and is 3350 square metres in size. In 2012/2013 there are 313 students enrolled making the Utilization Rate 79%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $9.11

    • Custodial Costs $33.43

    • Utility Costs $20.00

    • TOTAL OPERATION AND MAINTENANCE COSTS $62.54


Gem School

Gem, Alberta

  • This school was built in 1949 with wood frame construction.
  • The interior of this school is finished with hardboard and drywall. The building is heated with a forced air furnace which was replaced in 2000.
  • In 1994 the school received a well insulated 2-ply modified roof as well as new windows therefore this building envelope is in very good condition.
  • The capacity of this school is 89 student spaces and is 846.8 square metres in size. In 2012/2013 there are 19 students enrolled making the Utilization Rate 21%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $20.14

    • Custodial Costs $35.05

    • Utility Costs $13.29

    • TOTAL OPERATION AND MAINTENANCE COSTS $68.48


Griffin Park School

805 - 4th Ave. Brooks, Alberta

  • This facility was built in 1979 with masonry construction. Also at that time, 4 portable classrooms were attached to the southeast end of the building. 2 more portables were added onto the existing portables in 1985. In 2006, 6 more portable classrooms were added to the east side of the school.
  • The core of this school is heated by a central hot water boiler. The portables (16 in total) have individual forced air furnaces and air conditioning units.
  • The capacity of this school is 611 student spaces and is 4938.33 square metres in size. In 2012/2013 there are 417 students enrolled making the Utilization Rate 68%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $6.51

    • Custodial Costs $26.10

    • Utility Costs $12.84

    • TOTAL OPERATION AND MAINTENANCE COSTS $45.45


Rolling Hills School

Rolling Hills, Alberta

  • This school was built in 1956 of masonry construction. In the summer of 1994 this school underwent some interior and exterior upgrading.
  • The exterior of the school had a portion of it stuccoed and it also had all of the exterior windows replaced. The interior of the school received some upgrading when the majority of the classroom flooring was replaced. The corridor flooring was all replaced in 1986.
  • The roof is in good condition as it was totally replaced in 1989. The steam boiler (original 1956) was inspected and x-rayed by boiler specialists and found to be in good condition.
  • The interior of this school is all block finish painted with an alkyd base paint. The finish throughout the school is in good shape.
  • The capacity of this school is 248 student spaces and is 2538.5 square metres. In 2012/2013 there are 70 students enrolled making the Utilization Rate 28%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $9.06

    • Custodial Costs $18.34

    • Utility Costs $7.43

    • TOTAL OPERATION AND MAINTENANCE COSTS $34.83


Rosemary School

Rosemary, Alberta

  • This facility was built in 1958 of masonry construction. All the interior walls are block and brick finish with alkyd base paint.
  • In 1992, all the corridor floor covering was replaced as well as most of the classroom flooring. In 1991, the gymnasium floor was replaced with a new floating maple hardwood floor.
  • The heating is supplied to this school through several forced air furnaces. In 1995, through emergency funding, all of the furnaces and/or heat exchangers were replaced in the school. In 2002, the Rosemary School was modernized.
  • The capacity of this school is 310 student spaces and is 3065.6 square metres in size. In 2012/2013 there are 236 students enrolled making the Utilization Rate 76%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $4.65

    • Custodial Costs $30.22

    • Utility Costs $19.33

    • TOTAL OPERATION AND MAINTENANCE COSTS $54.20


Sunrise School

411 - 7th Street East Brooks, Alberta

  • This facility was originally constructed in 1992 and was utilized by the Maintenance Department until 2001. The facility was then refurbished as an Outreach School.
  • This school is heated by hot water and forced air.
  • Sunrise School has a capacity of 75 student spaces and is 910 square metres in size. In 2012/2013 there are 55 students enrolled making the Utilization Rate 35%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $11.21

    • Custodial Costs $33.24

    • Utility Costs $17.71

    • TOTAL OPERATION AND MAINTENANCE COSTS $62.16


Tilley School

Tilley, Alberta

  • The original wood frame school was built in 1947 and in 1959 a masonry constructed high school was built on to the northeast corner of the original building. In 1992, the entire school structure was modernized which brought all the electrical and mechanical components up to standard.
  • This school is heated with two centrally located glycol heaters. This, in conjunction with the roof top mounted ventilation unit, is providing adequate room temperatures in the winter as well as strong ventilation for the warmer days.
  • The building envelope is in relatively good condition as all the school's glazing has been replaced since 1989.
  • The capacity of this school is 323 student spaces and is 3056.7 square metres. In 2012/2013 there are 112 students enrolled making the Utilization Rate 35%.
  • 2012/2013 Plant Operation and Maintenance Costs per square metre:
    • Maintenance Costs $7.75

    • Custodial Costs $26.05

    • Utility Costs $12.07

    • TOTAL OPERATION AND MAINTENANCE COSTS $45.87